Linear and quadratic algorithms for scheduling chains and opposite chains

View publication

Abstract

One basic scheduling problem of parallel systems is the scheduling of chains, the simplest form of precedence constraints between tasks. When tasks have unit-execution-times, the simple level algorithm minimizes the schedule length (or makespan). However, the time complexity is linear in the number of tasks and exponential in the size of the problem if a succinct coding is used. If some tasks are multiprocessor tasks, which require more than one processor at a time, the problem becomes more complicated and several NP-hardness results as well as polynomial algorithms (in the number of tasks) for practically important special cases (e.g. opposite chains) were obtained in the literature. Again, these solutions are exponential in the size of the problem if a succinct coding is used. In this paper we re-address the problem of scheduling chains and opposite chains. We consider both preemptive and nonpreemptive schedules. We first propose variants of largest remaining task (LRT) and highest level first (HLF) algorithms for chains of unit-width tasks. We then apply these new algorithms to the scheduling of unit-width chains and opposite chains. For the case of unit-width chains, we assume that tasks may have different ready (arrival) times. For both preemptive and nonpreemptive tasks, we obtain optimal scheduling algorithms of quadratic time complexity in the number of chains. © 2002 Elsevier Science B.V. All rights reserved.

Date

Publication

EJOR

Authors

Topics

Share